Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 34 results ...

Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities, Unpublished PhD Thesis, , Illinois Institute of Technology.

Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents, Unpublished PhD Thesis, , Illinois Institute of Technology.

Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alavipour, S M (2017) Project scheduling using optimized financing, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alkoud, A (2023) Investigating the impact of tall building ordinances (TBOs) on the evolution of ultra-tall buildings typology: Case studies in Chicago and Dubai, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms, Unpublished PhD Thesis, , Illinois Institute of Technology.

Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM, Unpublished PhD Thesis, , Illinois Institute of Technology.

Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids, Unpublished PhD Thesis, , Illinois Institute of Technology.

Gunaydin, H M (1999) Impact of information technologies on project management functions, Unpublished PhD Thesis, , Illinois Institute of Technology.

Gunhan, S M (2003) Foreign market entry decision model for construction companies, Unpublished PhD Thesis, , Illinois Institute of Technology.

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions, Unpublished PhD Thesis, , Illinois Institute of Technology.

Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kale, S (1999) Competitive advantage in the construction industry: Firm-specific resources and strategy, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites, Unpublished PhD Thesis, , Illinois Institute of Technology.

Koksal, A (2002) Predicting the development of decline in construction companies, Unpublished PhD Thesis, , Illinois Institute of Technology.

Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system, Unpublished PhD Thesis, , Illinois Institute of Technology.

Lee, D-E (2004) Construction business automation system (CBAS), Unpublished PhD Thesis, , Illinois Institute of Technology.

Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty, Unpublished PhD Thesis, , Illinois Institute of Technology.

Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings, Unpublished PhD Thesis, , Illinois Institute of Technology.

Mochtar, K (2000) Market-based pricing in construction, Unpublished PhD Thesis, , Illinois Institute of Technology.

Pandey, A R (2016) Heuristic decision-making model for electrical foremen when workflow is disrupted, Unpublished PhD Thesis, , Illinois Institute of Technology.

Pulket, T (2008) Universal prediction model for construction litigation, Unpublished PhD Thesis, , Illinois Institute of Technology.

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory, Unpublished PhD Thesis, , Illinois Institute of Technology.

Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration, Unpublished PhD Thesis, , Illinois Institute of Technology.

Rujirayanyong, T (2004) Data warehousing for construction, Unpublished PhD Thesis, , Illinois Institute of Technology.

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures, Unpublished PhD Thesis, , Illinois Institute of Technology.

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology, Unpublished PhD Thesis, , Illinois Institute of Technology.

Tokdemir, O B (2003) ALISS: Advanced linear scheduling system, Unpublished PhD Thesis, , Illinois Institute of Technology.

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhang, C (2013) Automated progress control using laser scanning technology, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhou, Q (2002) From CAD to IAD: An internet application of steel construction consulting for architects, Unpublished PhD Thesis, , Illinois Institute of Technology.

  • Type: Thesis
  • Keywords: fragmentation; collaboration; information technology; architects; organizational structure; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305510382
  • Abstract:
    Information technology has become so powerful and interactive that what is conventionally called CAD might evolve into iAD (Internet Aided Design). For Internet applications in the AEC (Architecture, Engineering and Construction) industry, most of the efforts and applications have been concentrated on project management and collaboration, while in the area of design and engineering consulting, limited progress has been made. Even with some of this success, contemporary development has not changed the nature of the fragmentation of the AEC industry. Based on previous research surveys of the development of Internet applications in the AEC industry and the proposal of a conceptual model of Internet-based engineering consulting in architecture, this thesis will apply these theories and concepts into a specified area of steel construction consulting for architects. The first phase of this research will define the content and scope of steel construction consulting and the potential Internet application. Second, a proposed solid working model is developed covering organizational structure, user network, services provided and technology. In the third phase, a prototype simulation is used to apply the concepts and methodology in a preliminary design application to demonstrate how this Internet-based consulting model would work.